Franklin Solar Project

large solar panel field in the Midwest

Project Specifications

A blue line icon of an industrial facility with two smokestacks, representing a manufacturing plant or processing facility. Commonly used to symbolize value-added agriculture or industrial operations.

Industry

Solar

A blue icon showing a checklist with three checkmarks next to a clock face, representing time management, scheduling, or tracking progress over time.

Completion Date

2022

Location

Hampton, IA

Interstates provided the electrical installation of a 7 megawatt solar field with single-axis tracking in Franklin County, IA. EDF Renewables performed the engineering and managed the construction of the project. Interstates and EDF collaborated to implement an efficient and effective electrical layout to combat the impacts of material escalations experienced in 2021.

Services Provided: Electrical Construction | Electrical Prefabrication

Key Scope Components

Interstates installed 37,000 feet of underground conduit, 220,000 feet of wire, and terminated 56 inverters that are fed by 4,300 photo-voltaic modules.

Download the Document